Route 4/4A Bridge

The purpose of this project is to replace the existing bridge on Route 4 near Mascoma Lake and to redesign the layout of the Route 4 and Route 4A intersection. This project is managed by the State of New Hampshire.

Peter M. Kehoe


NHDOT Contract Administrator
Lebanon 13951
Phone: 603-491-7291
Email