Construction Projects

  1. Combined Sewer Overflow Projects

    The City is implementing the elimination of our Combined Sewer Overflow projects by separating the sanitary wastewater system from the storm water system under a schedule which will have all CSOs eliminated by 2020.

  2. Dulac Street Reconstruction Project

    Learn about the Dulac Street Reconstruction Project, get updates and see who is affected.

  3. NH 120 Pedestrian / Bicycle Improvements Project

    Get more information about the NH 120 Pedestrian/Bicycle Improvements Project including areas affected and duration of the project.

  4. NH 120 / Etna Road Sewer Improvements

    The intent of the project is to replace an existing deficient sewer line, which is at capacity and unable to accept additional flows.

  1. Mechanic Street Improvement Project

    The Mechanic Street Reconstruction Project has been in the que for well over 10 years and is slotted for re-construction to begin in 2016 as per the NHDOT- 10 year plan.

  2. Mascoma Street I-89 Bridge Project

    View the details of the Mascoma Street I-89 Bridge Project in Lebanon.

  3. Route 4/4A Bridge

    The purpose of this project is to replace the existing bridge on Route 4 near Mascoma Lake and to redesign the layout of the Route 4 and Route 4A intersection.

  4. Rt. 4 Lebanon-Hartford Bridge

    The purpose of the project is to replace the bridge over the Connecticut River between West Lebanon and Hartford, VT.